Run review
The review points a run can stop at before it builds: confirm or co-sign its acceptance criteria, edit one criterion, and request changes to, extend or skip its spec and plan review. Most need a signed-in person; a stale review round or a closed review returns 409.
- Co-sign an auto-approved run's criteria POST
- Edit a drafted acceptance criterion POST
- Extend a run's spec review window POST
- Get the full text of a run's plan GET
- Confirm a run's acceptance criteria POST
- Request changes to a run's plan POST
- Request changes to a run's drafted spec POST
- Start building without confirming the spec POST